Our Working Process

  • 01
    Schematic Design
  • 02
    Design Development
  • 03
    Drawing & Specifications
  • 04
    Costing &Negotiations
  • 05
    Construction
– Data collection and requirement study – Preliminary design concepts – Landscape and Engineering consultant input – Presentation of design concepts to owner – Owner review and input – Schematic design finalized
– Preliminary design of building system with consulting engineers – Preliminary design of interior concept with consulting architect – Presentation of design development to owner – Review of project cost estimate with owner – Owner review and input – Design finalized
– Working drawings and specifications production – Owner review
– Competitive pricing – Contract awarded
– Construction begins with on-site construction observation – Substantial completion – Owner Occupancy – Building review by Architect and Interior designer